Rough-In Permanent Service | 12/30/1999 | 12/30/1999 | 12/30/1999 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 12/30/1999 at 08:43:44. Contact: ###-####. Ok final.
|
Rough-In Permanent Service | 12/29/1999 | 12/29/1999 | 12/29/1999 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/29/1999 at 08:42:32. Contact: ###-####. 300-5 conduit 18 below grade called left message.
|
Final | 12/28/1999 | 12/28/1999 | 12/28/1999 | P | FAIL |
Pat Lass
|
|
|
Billy ###-####. Open trench and install id tag.
|