Final | 1/3/2000 | 1/3/2000 | 1/3/2000 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/03/2000 at 09:42:51. Contact: ###-####. P/S ok final.
|
Final | 12/29/1999 | 12/29/1999 | 12/29/1999 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/29/1999 at 10:35:09. Contact: ###-####. Ground rods 6ft. apart and 45 deg.
|
Final | 12/27/1999 | 12/28/1999 | 12/28/1999 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/27/1999 at 11:47:45. Contact: ###-####. Locate ground rods and remove circuit to house.
|