Final | 5/8/2000 | 5/8/2000 | 5/8/2000 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 05/08/2000 at 09:32:06. Contact: ###-####.
|
Final | 3/9/2000 | 3/10/2000 | 3/10/2000 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 03/09/2000 at 14:27:55. Contact: ###-####. No access. 3/14/00 11:59:06 AM
|
Electrical Rough-In | 12/29/1999 | 12/29/1999 | 12/29/1999 | P | PASS |
Joe Ray
|
|
|
###-#### Jim
|