Final | 3/6/2000 | 3/6/2000 | 3/6/2000 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 03/06/2000 at 08:52:17. Contact: ###-####. completed. 3/7/00 8:51:10 AM
|
Electrical Rough-In | 2/24/2000 | 2/24/2000 | 2/24/2000 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 02/24/2000 at 09:27:55. Contact: ###-####. Ceiling Ele. R/I. 2/25/00 9:33:30 AM
|
Electrical Rough-In | 1/4/2000 | 1/4/2000 | 1/4/2000 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 01/04/2000 at 07:57:15. Contact: ###-####. Dr. Rand office; Ele. R/I.
|