Final | 1/24/2000 | 1/24/2000 | 1/24/2000 | P | PASS |
Joe Ray
|
|
|
ROMAR ELEC-- ###-#### FN INSP
|
Final | 1/18/2000 | 1/18/2000 | 1/18/2000 | P | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 01/18/2000 at 09:22:44. Contact: ###-####. T/O. 1/20/00 8:52:12 AM
|
Permanent Service | 1/3/2000 | 1/3/2000 | 1/3/2000 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 01/03/2000 at 10:28:38. Contact: ###-####.
|
Electrical Rough-In | 12/29/1999 | 12/30/1999 | 12/30/1999 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/29/1999 at 16:54:08. Contact: ###-####. R/I wall only.
|