Final | 2/3/2000 | 2/3/2000 | 2/3/2000 | P | PASS |
Jim Schmer
|
|
|
OK.
|
Electrical Rough-In | 1/4/2000 | 1/6/2000 | 1/6/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 01/04/2000 at 13:40:24. Contact: ###-####.
|
Electrical Rough-In | 1/3/2000 | 1/5/2000 | 1/4/2000 | A | CANC |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 01/03/2000 at 14:14:10. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 01/04/2000 at 13:39:02.
|