DOC - Permit Finaled | 11/8/2010 | 11/8/2010 | 11/8/2010 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 9/2/2003 | 9/4/2003 | 9/4/2003 | A | PASS |
Steven Webb
|
|
|
|
BMP Violation | 8/29/2003 | 9/3/2003 | 9/3/2003 | A | PART |
Steven Webb
|
|
|
|
BMP Violation | 8/26/2003 | 8/29/2003 | 8/29/2003 | A | PART |
Steven Webb
|
|
|
Issued correction notice will follow up 8/29/2003 9:42:45 AM
|
BMP Violation | 8/26/2003 | 8/26/2003 | 8/26/2003 | A | FAIL |
Steven Webb
|
|
|
Verbal correction--Clean up needed on sidewalks, streets internally, also storm drain protection required. Sweep daily or as needed. Will follow up. Construction entrance/parking needed if contractors are to continue to use. 8/26/2003 10:46:02 AM
|
Site Preparation | 3/24/2003 | 3/26/2003 | 3/26/2003 | P | PASS |
Steven Webb
|
|
|
Erosion and sediment plan including narrative is on site---reviewed plan with contractor. 3/26/2003 3:43:40 PM
|
Site Preparation | 3/21/2003 | 3/24/2003 | 3/24/2003 | A | PART |
Steven Webb
|
|
|
No one at contractor trailer--Inspected work areas--appears ok. Need to review the approved plans. 3/24/2003 1:54:50 PM
|