Site Preparation | 6/4/2003 | 6/6/2003 | 6/6/2003 | A | PASS |
Steven Webb
|
|
|
|
BMP Violation | 6/2/2003 | 6/4/2003 | 6/4/2003 | A | PART |
Steven Webb
|
|
|
Items on prior c/n completed--Informed new RP (Gill-###-####) to straw wattle around stockpiled soils on pavement outside work area or remove from that position. Will follow-up. 6/4/2003 9:44:49 AM
|
BMP Violation | 6/2/2003 | 6/2/2003 | 6/2/2003 | P | FAIL |
Steven Webb
|
|
|
RP-Tim Freer-###-####-ESI ###-####. Issued correctin notice--complete by 6/3/03 end of day or stop work can be issued. 6/2/2003 1:34:36 PM
|
Site Preparation | 4/14/2003 | 4/16/2003 | 4/16/2003 | A | PASS |
Steven Webb
|
|
|
|
Site Preparation | 4/14/2003 | 4/14/2003 | 4/14/2003 | P | PART |
Steven Webb
|
|
|
Contacted Contrador regarding a couple of items, i.e. storm drain inlets, track-out. Tim (rp)--###-####. RP will take care of issued--will perform follow-up. 4/14/2003 5:01:56 PM
|