DOC - Permit Finaled | | | 5/6/2004 | | DONE |
|
|
|
|
Site Preparation | 6/19/2003 | 6/20/2003 | 6/20/2003 | A | CANC |
Steven Webb
|
|
|
|
Site Preparation | 6/19/2003 | 6/20/2003 | 6/20/2003 | A | PART |
Steven Webb
|
|
|
Talked to RP-T. Campbell--Maintain per erosion plan including sweeping of dirt in road and sidewalk. 6/19/2003 9:37:48 AM
|
Site Preparation | 6/19/2003 | 6/20/2003 | 6/20/2003 | A | PASS |
Steven Webb
|
|
|
Paint cleaned up, straw wattles installed. 6/20/2003 9:16:16 AM
|
BMP Violation | 6/19/2003 | 6/19/2003 | 6/19/2003 | A | FAIL |
Steven Webb
|
|
|
Conference with RP--Verbal correction with timeframe by end of day to clean up paint residue from garage apron, sidewalk and street and to remove other pollutants from same. BMP's to be in place. 6/19/2003 9:08:16 AM
|
Site Final | 5/15/2003 | 5/16/2003 | 5/16/2003 | A | PASS |
Steven Webb
|
|
|
Site preparation not final. 5/16/2003 10:07:45 AM
|
Site Preparation | 5/15/2003 | 5/15/2003 | 5/15/2003 | A | PART |
Steven Webb
|
|
|
Verbal instructions to R. P. Doug ###-#### 5/15/2003 10:38:30 AM
|