Permit Information
Permit NumberESC03-00609
StatusFinaled
Name MICHAEL S HOMAN
Site Address 2340 N 15TH ST
Project NameAFTON STREET DEV
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled11/8/201111/8/201111/8/2011PPASS
DetailsClint A Smith
Site Preparation10/29/200411/10/200411/10/2004ACANC
DetailsAimee Hughes
Site Preparation10/29/200411/10/200411/10/2004APASS
DetailsAimee Hughes
entrance to subdivision looks okay. 11/10/2004 9:04:42 AM
BMP Violation10/28/200410/29/200410/29/2004APASS
DetailsAimee Hughes
gravel bags have been replaced and sediment has been cleaned out. will follow up. 10/29/2004 8:54:50 AM
BMP Violation10/28/200410/28/200410/28/2004APART
DetailsSteven Webb
Citizen Compliant: No valid RP which is required by BCC 8-17. Informed owner to get certified RP on permit also remove sediment from gravel bags both uphill and downhill and replace broken bags with new bags. Will follow up. 10/28/2004 8:17:55 AM
Site Preparation10/28/200410/28/200410/28/2004APART
DetailsSteven Webb
Stormwater compliant
Conference7/21/20047/21/20047/21/2004APART
DetailsSteven Webb
Random inspection Rill/gully erosion observed on bare hillsides. RP had been warned of this earlier. Silt fence and straw wattles are now in place, should help minize further damage. Minor trackout observed. 7/21/2004 7:44:27 AM
BMP Violation3/12/20043/15/20043/15/2004PPART
DetailsSteven Webb
General cleanup has occurred. 3/15/2004 8:59:45 AM
Tracking Control3/12/20043/12/20043/12/2004APART
DetailsSteven Webb
Informed rp G. Pulley 3718450 that additional cleanup on hard surface is needed. Plus, cleaning behind sand bags in gutters. Noticed recent hydroseeding, but the possiblility that this will wash out if significate rain event occurres. Recommend additional measures. 3/12/2004 8:43:56 AM
Conference2/6/20042/9/20042/9/2004ADONE
DetailsSteven Webb
10:00 a.m with rp and pd.
Site Preparation1/23/20042/9/20042/9/2004AFAIL
DetailsSteven Webb
Issued c/notice to rp. Complete all items by end of the day on sunday 2/15/04 or further enforcement will be required. Will follow up on Monday 2/16/04. 2/9/2004 10:27:48 AM
BMP Violation2/6/20042/6/20042/6/2004AFAIL
DetailsSteven Webb
Informed rp G. Pulley ###-#### to stop work until erosion provisions are in place. Rill erosion, mud on hard surfaces, d.i's need protection and/or maintained, slope stablization is needed to prevent further failures. Will meet with rp and pd Monday at 10:00 a.m. Photos taken. 2/6/2004 11:22:43 AM
BMP Violation1/16/20041/21/20041/21/2004APART
DetailsSteven Webb
Super silt fence re-installed? Silt fence re-installed. 1/23/2004 12:13:36 PM
BMP Violation1/16/20041/16/20041/16/2004PPART
DetailsSteven Webb
Greg Pulley RP ###-####9 Verbal correction--Informed RP to re-install super silt fence at toe of slope between bare soil and south side of property. Will take care of. Common bare slopes will need to be stablized. 1/16/2004 2:18:48 PM
Site Preparation8/8/20038/18/20038/18/2003APASS
DetailsSteven Webb
Site Preparation8/8/20038/8/20038/8/2003ADONE
DetailsSteven Webb
Reviewed plans and bmp's with p.d. (david bailey) and r.p (greg pulley -- american paving @ ###-####. Wire is needed per narrative behind installed silt fence. Should conditions warrent, additional bmp's to be installed prior to timeframe outline in narrative; i.e. mulch, tracking, silt fencing, straw bales, straw wattles, etc. Will follow up. 8/8/2003 10:26:44 AM