Site Final | 8/22/2006 | 8/22/2006 | 8/22/2006 | P | PASS |
Aimee Hughes
|
|
|
Final stablization has been completed.
|
BMP Violation | 5/17/2004 | 5/18/2004 | 5/18/2004 | A | PASS |
Steven Webb
|
|
|
Looks good. Sediment barrier installed behind sidewalk and sweeping has been done. Sweep daily or as needed. 5/19/2004 8:42:15 AM
|
BMP Violation | 5/17/2004 | 5/17/2004 | 5/17/2004 | A | FAIL |
Steven Webb
|
|
|
Correction to Marshall ###-####. Rill erosion occurring from lot onto sidewalk and street. Sediment barriers needed both sides of sidewalk. Complete by the end of today.. 5/17/2004 9:44:51 AM
|