DOC - Permit Finaled | 3/3/2006 | 3/3/2006 | 3/3/2006 | P | PASS |
Aimee Hughes
|
|
|
|
Site Preparation | 5/17/2004 | 5/17/2004 | 5/17/2004 | P | PART |
Steven Webb
|
|
|
Informed rp to control access to job site. Limit to one or two and install per plan. Sweep daily or as needed. 5/17/2004 3:09:43 PM
|
Tracking Control | 12/31/2003 | 12/31/2003 | 12/31/2003 | A | CANC |
Steven Webb
|
|
|
|
Tracking Control | 12/31/2003 | 12/31/2003 | 12/31/2003 | P | PART |
Steven Webb
|
|
|
|
BMP Violation | 12/12/2003 | 12/15/2003 | 12/15/2003 | A | PASS |
Steven Webb
|
|
|
|
BMP Violation | 12/3/2003 | 12/5/2003 | 12/5/2003 | A | PASS |
Steven Webb
|
|
|
|
Tracking Control | 11/19/2003 | 12/3/2003 | 12/3/2003 | A | FAIL |
Steven Webb
|
|
|
Issued c/notice-- 12/3/2003 2:14:54 PM
|
Site Preparation | 11/17/2003 | 11/19/2003 | 11/19/2003 | A | PART |
Steven Webb
|
|
|
Site conditions have not changed since last inspection. Sweeping and construction entrance is needed prior to any further construction. 11/19/2003 8:52:25 AM
|
Site Preparation | 11/4/2003 | 11/17/2003 | 11/17/2003 | A | CANC |
Steven Webb
|
|
|
|
BMP Violation | 11/4/2003 | 11/4/2003 | 11/4/2003 | P | PART |
Steven Webb
|
|
|
Ody Steiger RP (Steed) ###-#### Reviewed construction site. Exit from site to Federal Way has been barricaded off. To date construction site entrance (south of property) not installed nor has track out been cleaned off of hard surface. Discussed with RP, his schedule is ok to address all bmp's prior to further work. No work being done on site at present. Will schedule follow up inspection. 11/4/2003 1:32:21 PM
|
BMP Violation | 11/3/2003 | 11/5/2003 | 11/3/2003 | A | CANC |
Steven Webb
|
|
|
|
BMP Violation | 11/3/2003 | 11/3/2003 | 11/3/2003 | P | FAIL |
Steven Webb
|
|
|
Oly Steiger RP--###-####. Steed Cons. No BMP's in place--track out. Verbal correction--Install all bmp's per plan. 11/3/2003 2:27:35 PM
|