Site Final | 8/22/2006 | 8/22/2006 | 8/22/2006 | P | PASS |
Aimee Hughes
|
|
|
Final stablization has been completed.
|
Tracking Control | 2/2/2004 | 2/4/2004 | 2/4/2004 | A | PASS |
Steven Webb
|
|
|
|
BMP Violation | 1/30/2004 | 2/2/2004 | 2/2/2004 | P | PART |
Steven Webb
|
|
|
Verbal to rp J. Walker--###-####. Sweeping of dirt from street and sidewalk unacceptable. Need to re-do. Will follow up. 2/2/2004 2:26:37 PM
|
BMP Violation | 1/30/2004 | 1/30/2004 | 1/30/2004 | A | FAIL |
Steven Webb
|
|
|
Justin Walker ###-#### RP Verbal correct to RP Remove dirt and debris from sidewalk and street. Need waste container on job site. Complete by noon on Monday or stop work can be issued. 1/30/2004 8:55:32 AM
|
Site Preparation | 12/16/2003 | 12/19/2003 | 12/19/2003 | A | PASS |
Steven Webb
|
|
|
|
Site Preparation | 12/16/2003 | 12/16/2003 | 12/16/2003 | A | PART |
Steven Webb
|
|
|
Informed rp J. Walker ###-#### to maintain, sweep daily or as needed. will follow up. 12/16/2003 9:29:03 AM
|