DOC - Permit Finaled | 6/22/2009 | 6/22/2009 | 6/22/2009 | P | PASS |
Steven Webb
|
|
|
|
Conference | 6/2/2008 | 6/2/2008 | 6/2/2008 | P | DONE |
Steven Webb
|
|
|
Reviewed site with J. Rogers after discussion with owner, L. Vosti. Confered with J. Rogers and will submit a letter summarizing scope of work which is needed to be in compliance with project.
|
Site Final | 2/26/2008 | 2/26/2008 | 2/26/2008 | P | FAIL |
Clint A Smith
|
|
|
Not ready, site not stabilzed nor bmps removed.
|
Site Final | 2/26/2008 | 2/26/2008 | 2/26/2008 | P | CANC |
Clint A Smith
|
|
|
|
Complaint Inspection | 11/6/2007 | 11/6/2007 | 11/6/2007 | P | FAIL |
Aimee Hughes
|
|
|
Correction notice issued to address stabilization needed along west side of property. What does ESC plan call for and how are they going to stabilize? Also, new RP must be listed on site. Issues must be completed by 11-21-07 or a stop work will be issued.
|
Complaint Inspection | 6/29/2007 | 6/29/2007 | 7/2/2007 | P | FAIL |
Aimee Hughes
|
|
|
verbal c/n to RP to address trash maintenance, dirt on sidewalk, and access control needing repaired.
|
Tracking Control | 11/29/2006 | 12/6/2006 | 12/8/2006 | A | PASS |
Aimee Hughes
|
|
|
SIte looks good, all issues or recommendations on previous meeting have been istalled or addressed.
|
Conference | 11/22/2006 | 11/29/2006 | 12/4/2006 | A | PART |
Steven Webb
|
|
|
|
Conference | 11/29/2006 | 11/29/2006 | 11/29/2006 | P | PASS |
Aimee Hughes
|
|
|
|
Conference | 11/22/2006 | 11/29/2006 | 11/29/2006 | A | PART |
Aimee Hughes
|
|
|
Met with owner's representative, sub-contractor, Steve Webb and myself to walk site and discuss final stabilization needs, D/I protection and trackout control. Spoke with RP about necessary bmp's that need to be installed and maintained. Will re-inspect site next week.
|
Complaint Inspection | 11/2/2006 | 11/13/2006 | 11/14/2006 | A | PEND |
Aimee Hughes
|
|
|
Met with concerned citizen regarding sediment build up along west side of property and the effect on the fence surrounding adjacent property. Contacted RP about final stabilization plans and what plan of action they are going to take to revegetate and stabilize that part of the project. I took some pictures that I'm going to have Steve Webb and Brian Murphy look at and get their input.
|
Complaint Inspection | 11/2/2006 | 11/2/2006 | 11/2/2006 | P | PEND |
Aimee Hughes
|
|
|
Received citizen complaint regarding fence along west side of property. Owner of storage facility is concerned about possible damage to his fence from bermed area. Spoke with RP about complaint and he will contact the developer to get approval to repair any damage done. I will follow up and inspect site with RP on 11-9-06.
|
Conference | 8/24/2006 | 8/24/2006 | 8/28/2006 | A | DONE |
Steven Webb
|
|
|
Removed Stop work parcel tag per Steve Webb
|
BMP Violation | 8/22/2006 | 8/22/2006 | 8/22/2006 | P | FAIL |
Aimee Hughes
|
|
|
Notice of violation issued by Steve Webb to contractor on site (Gulley Excavation). Work was being done which is in violation of the current stop work that was issued on 7-27-06. Contractor/Owner has five days to get all bmp's installed as called for in approved ESC plan or a citation will be issued. RP has been notified of action taken today as well as the owner of the property. Site will be re-inspected on 8-30-06 for compliance or sooner if Steve Webb is called for a re-inspection.
|
Random Inspection | 8/21/2006 | 8/21/2006 | 8/21/2006 | P | CANC |
Aimee Hughes
|
|
|
|
Random Inspection | 8/18/2006 | 8/18/2006 | 8/21/2006 | P | CANC |
Aimee Hughes
|
|
|
|
BMP Violation | 7/24/2006 | 7/25/2006 | 7/27/2006 | A | FAIL |
Aimee Hughes
|
|
|
Stop Work issued. Issues on previous correction notice have not been addressed. Contacted RP about stop work, requirements, and need for re-inpsection before stop work can be lifted. Pictures of job site are on file.
|
BMP Violation | 7/19/2006 | 7/24/2006 | 7/24/2006 | A | CANC |
Aimee Hughes
|
|
|
Follow up.
|
BMP Violation | 7/20/2006 | 7/19/2006 | 7/20/2006 | A | FAIL |
Aimee Hughes
|
|
|
C/N psted to address issues discussed with RP and Steve Webb on 7-19-06.
|
Random Inspection | 7/19/2006 | 7/19/2006 | 7/19/2006 | P | FAIL |
Steven Webb
|
|
|
No signage, construction entrance not per industry standards, need sediment barrier at property line along Walling, designated concrete washout needed. Complete compliance by the end of the week or a stop work order will be issued.
|
Random Inspection | 7/19/2006 | 7/19/2006 | 7/19/2006 | P | CANC |
Steven Webb
|
|
|
|
Complaint Inspection | 6/8/2006 | 6/8/2006 | 6/8/2006 | P | PASS |
Aimee Hughes
|
|
|
Responded to citizen complaint regarding dust control. Walked site to inspect sediment barriers and perimeter control. Site looks okay, notified complaintant. Will inspect site regularly.
|
BMP Violation | 6/7/2006 | 6/7/2006 | 6/7/2006 | P | PART |
Aimee Hughes
|
|
|
Talked to RP about watching construction entrance to make sure it is adequate for preventing any trackout onto Warm Springs. Also suggested that some type of access control be installed along site facing Warm Springs if problems arise with contractors or people bypassing construction entrance.
|
Tracking Control | 5/10/2004 | 5/10/2004 | 5/10/2004 | A | PART |
Steven Webb
|
|
|
Informed contractor to install approved construction entrance or cease activities upon occurance of a rain event. 5/10/2004 11:20:54 AM
|
BMP Violation | 4/27/2004 | 4/28/2004 | 4/28/2004 | A | DONE |
Steven Webb
|
|
|
Removed stop work. RP to change general information with correct information under permit number. Post signage at job site. 4/28/2004 7:57:55 AM
|
Site Preparation | 4/28/2004 | 4/28/2004 | 4/28/2004 | P | PASS |
Steven Webb
|
|
|
sign is posted, site looks ok. Sweep daily or as needed. 4/28/2004 3:11:57 PM
|
BMP Violation | 4/27/2004 | 4/27/2004 | 4/27/2004 | A | FAIL |
Steven Webb
|
|
|
JLR issued correction notice and stop work issued. No one on site, work being done on a stop work order issued 3/17/04. Call steve or jim. No work allowed at this time. 4/27/2004 10:28:51 AM
|
Conference | 3/19/2004 | 3/24/2004 | 3/24/2004 | A | DONE |
Steven Webb
|
|
|
No activity on site. 3/24/2004 2:01:18 PM
|
Conference | 3/22/2004 | 3/22/2004 | 3/22/2004 | P | DONE |
Steven Webb
|
|
|
|
Site Preparation | 3/18/2004 | 3/19/2004 | 3/19/2004 | A | DONE |
Steven Webb
|
|
|
Still no activity on site. Stop Work in effect. 3/19/2004 2:34:22 PM
|
Site Preparation | 3/18/2004 | 3/18/2004 | 3/18/2004 | P | DONE |
Steven Webb
|
|
|
Checking to see if construction activity is occurring since a stop work is still in effect. No activitiy observed. 3/18/2004 2:19:26 PM
|
Site Preparation | 3/17/2004 | 3/17/2004 | 3/17/2004 | A | FAIL |
Steven Webb
|
|
|
Issued stop work for rp not being with company listed, no bmp's in place, no plan or site. Stop work until all items corrected and inform Boise City to perform on site inspection. 3/17/2004 10:01:24 AM
|
Site Preparation | 3/17/2004 | 3/17/2004 | 3/17/2004 | P | NR |
Steven Webb
|
|
|
Stop work still in effect. 3/18/2004 7:18:29 AM
|