Site Preparation | 2/25/2005 | 3/1/2005 | 3/1/2005 | P | PASS |
Steven Webb
|
|
|
|
Site Final | 2/25/2005 | 2/25/2005 | 2/25/2005 | P | PART |
Steven Webb
|
|
|
Sediment and debris in gutter and on sidewalk, Need to sweep and clean up. Will follow up. 2/25/2005 3:02:26 PM
|
Site Preparation | 9/17/2004 | 9/17/2004 | 9/17/2004 | A | PART |
Steven Webb
|
|
|
Job site is mostly in compliance with ESC plan. Informed RP to be aware of the drop inlet located in the street. Crews are doing a good job of keep street/curb and sidewalk swepth. 9/17/2004 10:57:57 AM
|