Site Final | 3/8/2007 | 3/8/2007 | 3/8/2007 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 9/21/2004 | 9/21/2004 | 9/21/2004 | A | PART |
Aimee Hughes
|
|
|
spoke with RP, site looks good, will follow up.
|
Tracking Control | 9/21/2004 | 9/21/2004 | 9/21/2004 | A | PART |
Aimee Hughes
|
|
|
spoke with RP, site looks good, will follow up.
|
Site Preparation | 4/29/2004 | 4/29/2004 | 4/29/2004 | P | PART |
Steven Webb
|
|
|
No sign and wrong rp. Correct. Verbal correction. 4/29/2004 2:53:06 PM
|
Conference | 3/11/2004 | 3/11/2004 | 3/11/2004 | A | DONE |
Steven Webb
|
|
|
|