DOC - Permit Finaled | 7/27/2005 | 7/27/2005 | 7/27/2005 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 8/20/2004 | 8/25/2004 | 8/25/2004 | A | PASS |
Steven Webb
|
|
|
|
Tracking Control | 8/20/2004 | 8/25/2004 | 8/25/2004 | A | PASS |
Steven Webb
|
|
|
|
Tracking Control | 8/20/2004 | 8/20/2004 | 8/20/2004 | A | PART |
Steven Webb
|
|
|
Correction to rp--sweep street, curb and sidewalk. Fill out stormwater sign. 8/20/2004 8:29:49 AM
|
Site Preparation | 5/27/2004 | 6/2/2004 | 6/2/2004 | A | PART |
Steven Webb
|
|
|
Ok to wait until backfill activities have been done to install silt fence. 6/2/2004 2:15:08 PM
|
Site Preparation | 5/27/2004 | 5/27/2004 | 5/27/2004 | P | PART |
Steven Webb
|
|
|
RP needs to be the one who has operational control. Talked to RP. 5/27/2004 3:24:51 PM
|