Site Final | 9/18/2006 | 9/18/2006 | 9/18/2006 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 12/17/2004 | 12/21/2004 | 12/21/2004 | A | PART |
Aimee Hughes
|
|
|
trackout was being addressed. spoke with RP. will follow up. 12/21/2004 1:11:42 PM
|
Tracking Control | 12/17/2004 | 12/17/2004 | 12/17/2004 | P | PART |
Steven Webb
|
|
|
Correction to rp regarding trackout. 12/17/2004 2:21:43 PM
|