Site Final | 4/7/2011 | 4/7/2011 | 4/7/2011 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 4/7/2011 | 4/7/2011 | 4/7/2011 | P | PASS |
Dave Hannah
|
|
|
|
Tracking Control | 11/4/2004 | 11/4/2004 | 11/4/2004 | A | PART |
Steven Webb
|
|
|
Discussed track out with RP Greg ###-####. Install provisions to minimize track out. Sweep daily or as needed. 11/4/2004 8:41:03 AM
|
BMP Violation | 10/1/2004 | 10/5/2004 | 10/5/2004 | A | PASS |
Steven Webb
|
|
|
re-inspect. Items on prior correction notice taken care of. Sweep daily or as needed. 10/5/2004 2:05:27 PM
|
BMP Violation | 9/30/2004 | 10/4/2004 | 10/4/2004 | A | CANC |
Steven Webb
|
|
|
C/N issued -- Permit has not been transferred to current contractor, approved ESC plan is not listed, no RP has been verified, no BMP's are being used. All issues must be addressed by Monday 10-4-04
|