Site Final | 9/18/2006 | 9/18/2006 | 9/18/2006 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 1/6/2005 | 1/6/2005 | 1/6/2005 | P | PASS |
Aimee Hughes
|
|
|
site looks fine. 1/6/2005 12:35:14 PM
|
Tracking Control | 12/27/2004 | 12/27/2004 | 12/27/2004 | A | PASS |
Aimee Hughes
|
|
|
site looks fine. reminded RP to have subs park on hard surface. 12/27/2004 10:43:34 AM
|
Site Preparation | 12/17/2004 | 12/21/2004 | 12/21/2004 | A | PART |
Aimee Hughes
|
|
|
trackout was being addressed. spoke with RP. will follow up. 12/21/2004 1:12:50 PM
|
Tracking Control | 12/17/2004 | 12/17/2004 | 12/17/2004 | P | PART |
Steven Webb
|
|
|
Correction to rp regarding trackout 12/17/2004 2:09:42 PM
|