Site Final | 9/1/2006 | 9/1/2006 | 9/1/2006 | P | PASS |
Aimee Hughes
|
|
|
|
Site Preparation | 1/3/2005 | 1/3/2005 | 1/3/2005 | P | NR |
Aimee Hughes
|
|
|
bld has not been issued yet and project is currently on hold. 1/4/2005 12:39:54 PM
|
Site Preparation | 12/17/2004 | 12/29/2004 | 12/29/2004 | A | PART |
Aimee Hughes
|
|
|
Contacted RP to set up Conference. left message. will follow up. Aimee: Call RP, request the plan be on site for this inspection. Update me please. Steve 1/3/2005 8:35:08 AM
|