Site Final | 11/27/2015 | 11/27/2015 | 11/27/2015 | P | PASS |
Chad Schwendiman
|
|
|
Work complete
|
Random Inspection | 9/14/2005 | 9/14/2005 | 9/14/2005 | P | FAIL |
Aimee Hughes
|
|
|
c/n issued for subdivision. trackout and d/i protection needs to be maintained. contacted RP.
|
Tracking Control | 3/15/2005 | 3/15/2005 | 3/15/2005 | P | PASS |
Aimee Hughes
|
|
|
|
Tracking Control | 2/25/2005 | 2/25/2005 | 2/25/2005 | A | PASS |
Aimee Hughes
|
|
|
site okay, street needs swept, contacted RP. 2/25/2005 10:32:01 AM
|
Tracking Control | 2/2/2005 | 2/2/2005 | 2/2/2005 | A | PART |
Aimee Hughes
|
|
|
contacted RP about trackout, yellow signs and trash 2/2/2005 8:59:16 AM
|
BMP Violation | 12/13/2004 | 12/16/2004 | 12/16/2004 | P | PASS |
Steven Webb
|
|
|
Follow up inspection.
|
Site Preparation | 12/9/2004 | 12/13/2004 | 12/13/2004 | P | PART |
Steven Webb
|
|
|
Discussed projects with rp Todd-@ ###-####. Need to secure signs better, sweep streets and remove port-a-pot to behind sidewalk. Will follow up. 12/13/2004 4:01:49 PM
|
Site Preparation | 12/9/2004 | 12/9/2004 | 12/9/2004 | P | FAIL |
Steven Webb
|
|
|
No signage, lumber & truss packages were delivered off of hard surface without any type of construction entrances, mud observed on hard surfaces. Informed manage of all supers that these items need to be corrected by the end of the weekend or further enforcement will be performed. Tim ###-####. 12/9/2004 2:01:25 PM
|