Site Final | 9/18/2006 | 9/18/2006 | 9/18/2006 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 5/13/2005 | 5/13/2005 | 5/13/2005 | P | PASS |
Aimee Hughes
|
|
|
site looks good.
|
Tracking Control | 4/18/2005 | 4/18/2005 | 4/18/2005 | P | PASS |
Aimee Hughes
|
|
|
|
Tracking Control | 4/4/2005 | 4/4/2005 | 4/4/2005 | A | PASS |
Aimee Hughes
|
|
|
|
Tracking Control | 2/14/2005 | 2/14/2005 | 2/14/2005 | A | PASS |
Aimee Hughes
|
|
|
site looks fine. 2/14/2005 10:42:48 AM
|
Tracking Control | 1/6/2005 | 1/6/2005 | 1/6/2005 | P | PASS |
Aimee Hughes
|
|
|
site looks fine. 1/6/2005 12:35:24 PM
|
Tracking Control | 12/17/2004 | 12/21/2004 | 12/21/2004 | A | PART |
Aimee Hughes
|
|
|
trackout was being addressed. spoke with RP. will follow up. 12/21/2004 1:13:08 PM
|
Tracking Control | 12/17/2004 | 12/17/2004 | 12/17/2004 | P | PART |
Steven Webb
|
|
|
Correction to rp regarding trackout. 12/17/2004 2:11:10 PM
|