Permit Information
Permit NumberESC05-00205
StatusFinaled
Name BRANDON COLE
Site Address 3437 E BOISE AVE
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled9/29/20059/29/20059/29/2005PPASS
DetailsAimee Hughes
Tracking Control8/2/20058/15/20058/15/2005APASS
DetailsAimee Hughes
site looks good.
Tracking Control8/2/20058/2/20058/2/2005PPART
DetailsAimee Hughes
contacted RP about ditch in front of property needing to be revegetated. site is going to be landscaped next week and ditch will be hydroseeded then. will follow up.
BMP Violation3/29/20053/30/20053/30/2005APASS
DetailsSteven Webb
Site ok to the degree to pull the stop work order. Discussed with contractor and RP (Brandon) that they need to continue to comply with the conditions attached to the general permit or further stop work orders will be issued. 3/30/2005 9:08:55 AM
BMP Violation3/29/20053/30/20053/29/2005PCANC
DetailsSteven Webb
BMP Violation3/29/20053/29/20053/29/2005PFAIL
DetailsSteven Webb
No changes to site. No access controls to keep people from excessive mud, construction entrance not acceptable. Still no response from permits responsible person. Noticed siders working on house under Stop Work Order. Being hispanic and limited english I did not issue citation. Informed contractor via voice mail that no work is allowed under stop work. Should further work be noticed that he could be issued a citation as well as the workers. Will follow up. 3/29/2005 1:34:43 PM
Tracking Control3/28/20053/29/20053/29/2005AFAIL
DetailsSteven Webb
No changes to site which would comply with correction notice and stop work. Stop work still active. 3/29/2005 1:28:37 PM
Tracking Control3/28/20053/29/20053/29/2005APASS
DetailsSteven Webb
Tracking Control3/25/20053/28/20053/28/2005PFAIL
DetailsSteven Webb
Stop work order issued. No work allowed until erosion/sediment compliance has been achieved. Refer to current correction notice, call Steve when ready to have inspection. 3/28/2005 12:29:01 PM
Tracking Control3/24/20053/25/20053/25/2005AFAIL
DetailsSteven Webb
No work has been done since leaving voice mails for both RP and Builder. No one on site. Posted written correction notice detailing violations. C/N allows work to be completed from now until Monday 3/28/05 12:00 noon or a stop work order will be issued. 3/25/2005 9:19:41 AM
BMP Violation3/24/20053/24/20053/24/2005AFAIL
DetailsSteven Webb
Correction to RP via voice mail. Tracking issues need to be addressed. Noticed 3 areas where vehicles have been entering/exiting site. Two areas have no construction entrances. One area is excessivly muddy, excessive tracking problems will continue until action is taken to resolve. Correct by the end of the day or a stop work order will be issued Friday morning. 3/24/2005 8:14:05 AM
BMP Violation2/24/20052/28/20052/28/2005AFAIL
DetailsSteven Webb
Issued Stop Work Order--Posted on telephone pole. Per last weeks correction notice all applicable conditions attached to ESC permit were to be in place by the end of the day on 2/27/05 or stop work was to be issued. No provisions in place currently; concrete was washed out at main road way into work site, no const. entrance, no trash container etc. Call for re-inspection when complete. 2/28/2005 8:13:57 AM
BMP Violation2/28/20052/28/20052/28/2005PPASS
DetailsSteven Webb
Stop work lifted. Verfied by Aimee that correction were in place. Continue to comply with esc conditions. 2/28/2005 3:41:56 PM
Site Preparation2/24/20052/24/20052/24/2005PFAIL
DetailsSteven Webb
Correction notice issued--Complete all conditions attached to ESC permit by the end of the day of 2/28/05 or a stop work wil be issued. Need construction entrance, wash out pit, trash container etc. 2/24/2005 2:56:49 PM