Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberESC05-00209
StatusFinaled
Name RICH DILAURA
Site Address 3300 S TEMPERANCE WAY
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final5/12/20065/12/20065/12/2006PPASS
DetailsAimee Hughes
Tracking Control4/20/20065/12/20065/12/2006ACANC
DetailsAimee Hughes
Tracking Control3/30/20064/20/20064/20/2006APASS
DetailsAimee Hughes
Site looks okay. All bmp's are being maintained.
Tracking Control3/9/20063/30/20063/30/2006APASS
DetailsAimee Hughes
Site looks good, all bmp's are being maintained.
Tracking Control3/9/20063/9/20063/9/2006PPASS
DetailsAimee Hughes
Site looks okay.
Tracking Control1/17/20061/31/20061/31/2006APASS
DetailsAimee Hughes
Site looks fine. All bmp's are being maintained. I am contacting all the RP's in the subdivision about minimal trackout.
Tracking Control1/17/20061/17/20061/17/2006PPASS
DetailsAimee Hughes
Site looks fine. Talked to RP about watching trackout during wet weather and also updating RP information on permit.
Tracking Control11/7/200511/7/200511/7/2005PPASS
DetailsAimee Hughes
Site looks fine.
Random Inspection10/10/200510/24/200510/24/2005APASS
DetailsAimee Hughes
Site looks fine.
Random Inspection10/10/200510/10/200510/10/2005PPASS
DetailsAimee Hughes
Site looks fine. Talked to RP about reposting ESC sign. Had new RP add name to permit.
Random Inspection9/26/20059/26/20059/26/2005PPASS
DetailsAimee Hughes
Site looks good.
Random Inspection7/25/20057/25/20057/25/2005PPASS
DetailsAimee Hughes
site looks okay.
Tracking Control5/23/20055/23/20055/23/2005PCANC
DetailsAimee Hughes
Tracking Control5/23/20055/23/20055/23/2005PPASS
DetailsAimee Hughes
met with RP to go over changes to ESC plan.
Tracking Control5/10/20055/10/20055/10/2005PPASS
DetailsAimee Hughes
site looks okay.
Conference4/26/20054/26/20054/26/2005PPASS
DetailsAimee Hughes
met with RP to inspection to approved plans. approved the modifications he made to the plan. site looks good.
Site Preparation4/8/20054/11/20054/11/2005PCANC
DetailsAimee Hughes
Tracking Control4/11/20054/11/20054/11/2005PCANC
DetailsAimee Hughes
Tracking Control4/11/20054/11/20054/11/2005PCANC
DetailsAimee Hughes
Site Preparation4/8/20054/8/20054/8/2005PDONE
DetailsSteven Webb
Received notice to start construction.