Site Final | 3/28/2007 | 4/17/2007 | 4/17/2007 | P | PASS |
Steven Webb
|
|
|
Refer to history
|
Site Final | 3/13/2007 | 3/29/2007 | 3/28/2007 | P | FAIL |
Steven Webb
|
|
|
Bare ground around house
|
Site Final | 3/13/2007 | 3/13/2007 | 3/13/2007 | P | FAIL |
Steven Webb
|
|
|
Verbal to RP; Bare ground requireds re-veg.
|
Tracking Control | 1/29/2007 | 1/29/2007 | 1/29/2007 | P | PASS |
Aimee Hughes
|
|
|
Site looks okay.
|
Tracking Control | 10/3/2006 | 10/23/2006 | 10/26/2006 | A | PASS |
Aimee Hughes
|
|
|
|
Tracking Control | 10/9/2006 | 10/9/2006 | 10/11/2006 | P | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 10/3/2006 | 10/3/2006 | 10/3/2006 | P | PASS |
Aimee Hughes
|
|
|
Site looks okay.
|
BMP Violation | 8/18/2006 | 8/18/2006 | 8/18/2006 | A | PART |
Steven Webb
|
|
|
Verbal to rp; verify signage, manage debris etc.
|
Site Preparation | 1/23/2006 | 1/23/2006 | 1/23/2006 | P | PART |
Steven Webb
|
|
|
Overall things look good; minor dirt track-out onto hard surfaces.
|
Site Preparation | 10/25/2005 | 11/2/2005 | 11/2/2005 | P | PART |
Steven Webb
|
|
|
Joe-###-####
|
Conference | 10/24/2005 | 10/24/2005 | 10/24/2005 | A | DONE |
Steven Webb
|
|
|
Received 48 hour notice
|