Site Final | 12/29/2010 | 12/29/2010 | 12/29/2010 | P | PASS |
Dixie Fellows
|
|
|
bond returned..finaled
|
Aging Inspection | 12/29/2010 | 12/29/2010 | 12/29/2010 | | PEND |
Dixie Fellows
|
|
|
|
Tracking Control | 10/6/2005 | 10/27/2005 | 10/27/2005 | A | PASS |
Aimee Hughes
|
|
|
Site looks fine.
|
Complaint Inspection | 10/5/2005 | 10/5/2005 | 10/6/2005 | P | PASS |
Aimee Hughes
|
|
|
Met with RP to go over approved ESC plan and address citizen complaint. Site looks fine, construction is underway and bmp's are installed as called for in plan.
|