Site Final | 11/21/2005 | 11/21/2005 | 11/21/2005 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 10/10/2005 | 10/10/2005 | 10/10/2005 | P | PASS |
Aimee Hughes
|
|
|
Site looks good. Talked to RP about maintaining trackout on Rookery Lane.
|
Random Inspection | 9/7/2005 | 9/7/2005 | 9/7/2005 | P | PART |
Aimee Hughes
|
|
|
Sites look okay, contacted RP about keeping up on trash and maintaining D/I's on Rookery.
|
Random Inspection | 5/27/2005 | 5/27/2005 | 5/27/2005 | P | PASS |
Aimee Hughes
|
|
|
site looks fine. contacted RP about focusing on trackout clean-up.
|
Tracking Control | 5/10/2005 | 5/10/2005 | 5/10/2005 | P | PASS |
Aimee Hughes
|
|
|
site looks okay. contacted RP about trackout, sweeper is scheduled for this afternoon
|
Tracking Control | 4/26/2005 | 4/26/2005 | 4/26/2005 | P | PART |
Aimee Hughes
|
|
|
contacted RP about sweeping all sites on Rookery Ln. he will have sweeper come in tonight.
|
Tracking Control | 4/11/2005 | 4/11/2005 | 4/11/2005 | P | PASS |
Aimee Hughes
|
|
|
contacted RP, street needs swept 4/11/2005 3:24:36 PM
|