Site Final | 4/22/2010 | 5/3/2010 | 5/3/2010 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 5/3/2010 | 5/3/2010 | 5/3/2010 | P | PASS |
Dave Hannah
|
|
|
|
Tracking Control | 3/16/2006 | 4/6/2006 | 4/6/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay.
|
Tracking Control | 2/24/2006 | 3/16/2006 | 3/16/2006 | A | FAIL |
Aimee Hughes
|
|
|
verbal c/n to RP. construction access needs to be better maintained and controlled. trackout will become a problem if wet weather continues.
|
Tracking Control | 2/2/2006 | 2/23/2006 | 2/24/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay.
|
Tracking Control | 1/12/2006 | 2/2/2006 | 2/2/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good.
|
Tracking Control | 1/12/2006 | 1/12/2006 | 1/12/2006 | P | PART |
Aimee Hughes
|
|
|
Driveway up to site needs to be maintained, construction entrance is not adequate to prevent trackout. Contacted RP.
|
Tracking Control | 11/9/2005 | 11/9/2005 | 11/9/2005 | P | PART |
Aimee Hughes
|
|
|
verbal c/n to RP. construction entrance or access control is needed to prevent trackout onto Roanoke. will follow up.
|
BMP Violation | 7/14/2005 | 7/15/2005 | 7/15/2005 | P | PASS |
Steven Webb
|
|
|
Follow up
|
BMP Violation | 7/14/2005 | 7/14/2005 | 7/14/2005 | P | FAIL |
Steven Webb
|
|
|
Phone #: ###-####: Correction to rp--need rock entrance, sweep sidewalk, post sign at main entrance, install sediment barrier at curve in road at upper area. Will follow up
|