Site Final | 5/18/2006 | 5/18/2006 | 5/18/2006 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 4/26/2006 | 5/17/2006 | 5/18/2006 | A | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 4/6/2006 | 4/27/2006 | 4/26/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good. All bmp's are being maintained.
|
Tracking Control | 3/16/2006 | 4/6/2006 | 4/6/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good. All bmp's are being maintained.
|
Tracking Control | 2/24/2006 | 3/16/2006 | 3/16/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good.
|
Tracking Control | 2/2/2006 | 2/23/2006 | 2/24/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good.
|
Tracking Control | 1/12/2006 | 2/2/2006 | 2/2/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good.
|
Tracking Control | 1/12/2006 | 1/12/2006 | 1/12/2006 | P | PASS |
Aimee Hughes
|
|
|
Site looks okay.
|
Tracking Control | 10/5/2005 | 10/19/2005 | 10/19/2005 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay. Spoke with RP about maintaining access control on empty lot to the east of the site.
|
Tracking Control | 9/21/2005 | 10/5/2005 | 10/5/2005 | A | PASS |
Aimee Hughes
|
|
|
Site looks good.
|
Random Inspection | 9/21/2005 | 9/21/2005 | 9/21/2005 | P | PASS |
Aimee Hughes
|
|
|
Site looks good. Contacted RP about maintaining d/i protection.
|
Tracking Control | 6/15/2005 | 6/29/2005 | 6/29/2005 | A | PASS |
Aimee Hughes
|
|
|
site looks good.
|
Site Preparation | 6/15/2005 | 6/15/2005 | 6/15/2005 | P | PASS |
Aimee Hughes
|
|
|
|