BMP Violation | 12/28/2005 | 1/3/2006 | 1/4/2006 | A | PART |
Aimee Hughes
|
|
|
Sites look better. Talked to RP about making sure that no one is parking on the bare soil.
|
BMP Violation | 12/27/2005 | 12/28/2005 | 12/28/2005 | A | PART |
Aimee Hughes
|
|
|
Spoke with RP about addressing issues on c/n. He is waiting on gravel for delivery/parking pad. All other issues are being addressed. I will follow up.
|
BMP Violation | 12/27/2005 | 12/27/2005 | 12/27/2005 | P | FAIL |
Aimee Hughes
|
|
|
Trash issue has been addressed from previous c/n, but issues still remain. c/n issued to address lack of provisions for preventing mud and dirt track-out. construction entrance or access control needed. contacted RP, left message. will follow up tomorrow.
|
Complaint Inspection | 12/27/2005 | 12/27/2005 | 12/27/2005 | A | FAIL |
Aimee Hughes
|
|
|
Follow up --Refer to posted correction notice on side window next to door on west side. Issue stop work if not in compliance.
|
Site Final | 12/27/2005 | 12/27/2005 | 12/27/2005 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Random Inspection | 10/14/2005 | 10/14/2005 | 10/14/2005 | P | FAIL |
Aimee Hughes
|
|
|
verbal c/n to RP. ESC signs must stay posted thru duration of job and street needs to be swept.
|