Site Final | 10/24/2006 | 10/24/2006 | 10/24/2006 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 10/3/2006 | 10/24/2006 | 10/24/2006 | A | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 9/12/2006 | 10/3/2006 | 10/3/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good.
|
Tracking Control | 9/12/2006 | 10/3/2006 | 10/3/2006 | A | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 8/29/2006 | 9/12/2006 | 9/12/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good, all bmp's are being maintained.
|
Tracking Control | 8/8/2006 | 8/29/2006 | 8/29/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good.
|
Tracking Control | 8/7/2006 | 8/8/2006 | 8/8/2006 | A | PART |
Aimee Hughes
|
|
|
Site looks okay, contacted RP about reposting ESC sign.
|
Random Inspection | 8/23/2005 | 8/23/2005 | 8/23/2005 | P | FAIL |
Aimee Hughes
|
|
|
No bmp's are in place. Foundation has been poured. contacted RP. will follow up.
|