Site Final | 3/6/2006 | 3/6/2006 | 3/6/2006 | P | PASS |
Aimee Hughes
|
|
|
|
Tracking Control | 2/13/2006 | 2/13/2006 | 2/13/2006 | P | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 1/25/2006 | 2/9/2006 | 2/13/2006 | A | PART |
Aimee Hughes
|
|
|
Site looks okay. Gutters and sidewalks need a bit of attention throughout subdivision. Contacting all RP's.
|
Tracking Control | 1/11/2006 | 1/25/2006 | 1/25/2006 | A | PART |
Aimee Hughes
|
|
|
Subdivision needs some attention as far as trackout. I am contacting all the builders in the subdivision as well as the developer.
|
Tracking Control | 12/22/2005 | 1/12/2006 | 1/11/2006 | A | PART |
Aimee Hughes
|
|
|
verbal c/n to RP. watch mud and dirt trackout on all sites in subdivision and make sure that ESC sign is posted. notifying all builders.
|
Random Inspection | 12/22/2005 | 12/22/2005 | 12/22/2005 | P | PART |
Aimee Hughes
|
|
|
verbal c/n to RP about watching trackout during wet weather and making sure that each job has an ESC sign posted.
|