Site Final | 12/23/2008 | 12/23/2008 | 12/23/2008 | P | PASS |
James Rogers
|
|
|
|
Tracking Control | 9/8/2006 | 9/29/2006 | 9/28/2006 | A | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 8/22/2006 | 9/7/2006 | 9/8/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay.
|
Tracking Control | 8/22/2006 | 8/22/2006 | 8/22/2006 | P | PASS |
Aimee Hughes
|
|
|
Site looks okay.
|
Tracking Control | 5/12/2006 | 6/2/2006 | 6/7/2006 | A | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 4/20/2006 | 5/12/2006 | 5/12/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay. All bmp's are being maintained.
|
Tracking Control | 3/30/2006 | 4/20/2006 | 4/20/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay. All bmp's are being maintained.
|
Tracking Control | 3/9/2006 | 3/30/2006 | 3/30/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good, all bmp's are being maintained.
|
Tracking Control | 2/15/2006 | 3/8/2006 | 3/9/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good. Foundation is being completed and trackout is under control.
|
Conference | 2/15/2006 | 2/15/2006 | 2/15/2006 | P | PASS |
Aimee Hughes
|
|
|
Met with RP to inspect site to approved plans. And discuss bmp changes.
|
Tracking Control | 1/17/2006 | 1/31/2006 | 1/31/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks fine. All bmp's are being maintained. I am contacting all the RP's in the subdivision about minimal trackout.
|
Tracking Control | 1/17/2006 | 1/17/2006 | 1/17/2006 | P | CANC |
Aimee Hughes
|
|
|
Construction has not started yet.
|