Site Final | 8/29/2006 | 8/29/2006 | 8/29/2006 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 5/19/2006 | 5/19/2006 | 5/19/2006 | P | PASS |
Aimee Hughes
|
|
|
Site looks good. Talked to RP about reposting ESC sign.
|
Site Final | 4/21/2006 | 5/19/2006 | 5/19/2006 | A | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 4/21/2006 | 4/21/2006 | 4/21/2006 | P | PART |
Aimee Hughes
|
|
|
verbal c/n to RP. trash on site needs to be removed and maintained. trash pickup is scheduled for today.
|
Site Preparation | 10/25/2005 | 10/25/2005 | 10/25/2005 | P | FAIL |
Steven Webb
|
|
|
C/N issued
|