Site Final | 9/14/2006 | 9/14/2006 | 9/14/2006 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 1/31/2006 | 1/31/2006 | 1/31/2006 | P | PASS |
Aimee Hughes
|
|
|
Site looks fine. All bmp's are being maintained. I am contacting all the RP's in the subdivision about minimal trackout.
|
Tracking Control | 1/30/2006 | 1/30/2006 | 1/30/2006 | P | FAIL |
Steven Webb
|
|
|
Correction to rp, sediment barrier needed where soils are being loaded out, 4 wheel vehicle parked off of hard surface, (during rain event).
|
Site Preparation | 12/22/2005 | 12/22/2005 | 12/22/2005 | P | PART |
Steven Webb
|
|
|
Maintain drop inlet, access controls, proper installation on sediment barriers.
|