DOC - Permit Finaled | 4/27/2009 | 4/27/2009 | 4/27/2009 | P | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 10/25/2005 | 10/25/2005 | 10/26/2005 | P | PASS |
Aimee Hughes
|
|
|
Site looks okay. Talked to RP about maintaining d/i protection.
|
Complaint Inspection | 10/17/2005 | 10/20/2005 | 10/21/2005 | A | PASS |
Aimee Hughes
|
|
|
Subdivision looks okay. Talked to RP about maintaining trackout through duration of project.
|
Complaint Inspection | 10/17/2005 | 10/17/2005 | 10/17/2005 | P | FAIL |
Aimee Hughes
|
|
|
Responded to citizen complaint. C/N issued for subdivision to address heavy trackout in streets, gutters and sidewalks. Contacted RP. Must be completed by 10-19, I will reinspect on 10-20.
|