Site Final | 7/9/2007 | 7/9/2007 | 7/9/2007 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Site Preparation | 10/10/2005 | 10/11/2005 | 10/11/2005 | A | FAIL |
Aimee Hughes
|
|
|
verbal c/n to RP. Streets and gutters in entire subdivision need to be swept and maintained. Will be completed by Friday 10-14-05.
|
Tracking Control | 9/26/2005 | 10/7/2005 | 10/10/2005 | A | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 9/26/2005 | 10/7/2005 | 10/10/2005 | A | PASS |
Aimee Hughes
|
|
|
Site looks good. Talked to RP about maintaining trackout on Rookery Lane.
|
Complaint Inspection | 9/23/2005 | 9/26/2005 | 9/26/2005 | A | PASS |
Aimee Hughes
|
|
|
Follow up--Refer to history.
|
Complaint Inspection | 9/23/2005 | 9/23/2005 | 9/23/2005 | P | FAIL |
Steven Webb
|
|
|
Correction to contractor--post signage and make sure other permit conditions are being maintained. Will follow up.
|