Site Final | 11/9/2007 | 11/9/2007 | 11/9/2007 | A | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 1/27/2006 | 1/27/2006 | 1/27/2006 | P | PART |
Aimee Hughes
|
|
|
Met with RP to discuss complaints from developer about mud and dirt trackout in subdivision. Contacted all builders in subdivision.
|
Tracking Control | 12/22/2005 | 12/22/2005 | 12/22/2005 | P | PART |
Aimee Hughes
|
|
|
verbal c/n to RP about watching trackout during wet weather and making sure that each job has an ESC sign posted.
|