Site Final | 1/30/2007 | 1/30/2007 | 1/30/2007 | P | PASS |
Aimee Hughes
|
|
|
|
Site Preparation | 5/30/2006 | 5/31/2006 | 5/30/2006 | P | PART |
Steven Webb
|
|
|
Follow up from yesterday: Still need measures to properly manage mortal and other concrete residual.
|
Random Inspection | 5/30/2006 | 5/30/2006 | 5/30/2006 | A | FAIL |
Steven Webb
|
|
|
Correction to rp; drop inlets unprotected; no signage. Informed rp to obtain compliance by the end of the day of further enforcement will occur. Will follow up
|