Site Final | 10/15/2007 | 10/15/2007 | 10/15/2007 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
BMP Violation | 1/26/2006 | 1/30/2006 | 1/30/2006 | P | PASS |
Steven Webb
|
|
|
Follow up inspection.
|
Conference | 1/26/2006 | 1/26/2006 | 1/26/2006 | P | DONE |
Steven Webb
|
|
|
As requested by rp; ; Phone #: ###-####: Reviewed items which are needed, straw wattle in back, maintainence on silt fence, top dressing of cons entrance and sweep daily hard surfaces or as needed.
|
Random Inspection | 1/25/2006 | 1/25/2006 | 1/25/2006 | P | PART |
Steven Webb
|
|
|
Corrrection to rp, need signage filled out, top dressing on cons entrance and hard surface swept.
|