DOC - Permit Finaled | 11/1/2007 | 11/1/2007 | 11/1/2007 | P | PASS |
Steven Webb
|
|
|
|
DOC - Permit Finaled | 3/8/2007 | 3/8/2007 | 3/8/2007 | P | PASS |
Steven Webb
|
|
|
|
Random Inspection | 3/8/2007 | 3/8/2007 | 3/8/2007 | P | DONE |
Steven Webb
|
|
|
|
DOC - Permit Finaled | 3/8/2007 | 3/8/2007 | 3/8/2007 | P | PASS |
Steven Webb
|
|
|
|
Random Inspection | 9/1/2006 | 9/1/2006 | 9/5/2006 | P | PART |
Steven Webb
|
|
|
|
Random Inspection | 7/7/2006 | 7/7/2006 | 7/7/2006 | P | PART |
Steven Webb
|
|
|
Overall things are good, signage, d.inlets protected. Minor track out on hard surfaces.
|
BMP Violation | 4/18/2006 | 4/21/2006 | 4/24/2006 | P | PASS |
Steven Webb
|
|
|
Follow up inspection
|
Random Inspection | 4/18/2006 | 4/18/2006 | 4/18/2006 | P | FAIL |
Steven Webb
|
|
|
Correction to rp
|
Random Inspection | 4/18/2006 | 4/18/2006 | 4/18/2006 | P | FAIL |
Steven Webb
|
|
|
Correction to rp--contractor not using correct concrete washout procedure, rock contruction entrance needs top dressing. Sweep hard surfaces.
|
Tracking Control | 3/7/2006 | 3/8/2006 | 3/8/2006 | P | PASS |
Steven Webb
|
|
|
Follow up inspection.
|
Complaint Inspection | 3/7/2006 | 3/7/2006 | 3/7/2006 | P | FAIL |
Steven Webb
|
|
|
STOP WORK ISSUED plus written correction notice. Excessive mud track out, hundreds of yards and then sediment laden water observed flowing into drop inlet close to irrigation canel.
|
Tracking Control | 3/7/2006 | 3/7/2006 | 3/7/2006 | P | PART |
Steven Webb
|
|
|
Lifted stop work but continued compliance to 8-17 is required. Mud trackout from project is not acceptable. Sweeping as needed is required. Protection of drop inlets is required.
|