Site Final | 4/4/2007 | 4/4/2007 | 4/4/2007 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 2/22/2006 | 3/1/2006 | 3/2/2006 | A | PART |
Aimee Hughes
|
|
|
Site looks okay. Talked to RP about keeping up on trash on site and making sure that the trash container is either covered or weighted down during windy weather.
|
BMP Violation | 2/15/2006 | 2/17/2006 | 2/22/2006 | A | PASS |
Aimee Hughes
|
|
|
Issues on c/n have been addressed. Spoke with RP about stockpiled soil in backyard. Soil is being used for landscaping and remainder is being removed from site. Soil may need to be stabilized if it is left unused for more than a 30-day period. I will follow up.
|
Tracking Control | 2/15/2006 | 2/15/2006 | 2/15/2006 | P | FAIL |
Aimee Hughes
|
|
|
c/n issued to address trash on site and lack of trash container. trackout on sidewalk and in gutter needs to be cleaned up and maintained. must be completed by the end of the day 2-16-06. I will reinspect on 2-17-06 a.m.
|
Tracking Control | 2/9/2006 | 2/9/2006 | 2/9/2006 | P | CANC |
Aimee Hughes
|
|
|
|