Tracking Control | 8/17/2007 | 9/3/2007 | 9/4/2007 | A | PART |
Aimee Hughes
|
|
|
verbal c/n to RP about equipment staged on lot adjacent to site. equipment has been removed and an adequate construction entrance will be installed if lot is used again.
|
Tracking Control | 8/17/2007 | 8/17/2007 | 8/17/2007 | P | PART |
Aimee Hughes
|
|
|
Met with RP to discuss issues from prior verbal c/n. Access control has been installed, sediment barriers have been installed, d/i's have been cleaned out, outlet protection has been installed. RP is currently getting bids for temporary stabilization. He will contact me when bids are complete and tactifier is scheduled.
|