Site Final | 6/11/2007 | 6/11/2007 | 6/11/2007 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 4/18/2007 | 4/18/2007 | 4/18/2007 | P | PART |
Aimee Hughes
|
|
|
Contacted all builders in subdivision about trash maintenance on sites, ESC signs and watching trackout and sediment in gutters.
|
Conference | 1/16/2007 | 1/16/2007 | 1/16/2007 | A | PART |
Aimee Hughes
|
|
|
Met with RP to inspect site and discuss bmp installation, made some recommendations regarding silt fence installation and maintenance.
|
BMP Violation | 1/4/2007 | 1/5/2007 | 1/5/2007 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay.
|
BMP Violation | 1/3/2007 | 1/4/2007 | 1/4/2007 | P | PEND |
Aimee Hughes
|
|
|
|
BMP Violation | 12/28/2006 | 12/28/2006 | 12/28/2006 | P | FAIL |
Aimee Hughes
|
|
|
verbal c/n to RP to address repairs needed on silt fence; suggested that silt fence be removed and wattle be used as sediment barrier.
|