Site Final | 12/3/2008 | 12/3/2008 | 12/3/2008 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 6/18/2008 | 6/30/2008 | 7/1/2008 | A | PASS |
James Rogers
|
|
|
No vertical construction
|
Site Preparation | 6/4/2008 | 6/18/2008 | 6/18/2008 | A | PART |
James Rogers
|
|
|
Foundation in, no vertical const.
|
Random Inspection | 6/4/2008 | 6/4/2008 | 6/4/2008 | P | PASS |
James Rogers
|
|
|
Foundation in, no vertical construction
|
Conference | 6/4/2007 | 6/4/2007 | 6/4/2007 | P | PASS |
Aimee Hughes
|
|
|
Met with RP to discuss BMP's and inspect site before construction begins.
|