Aging Inspection | 3/4/2010 | 3/4/2010 | 3/4/2010 | | PASS |
Dave Hannah
|
|
|
|
Site Final | 3/4/2010 | 3/4/2010 | 3/4/2010 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 3/4/2010 | 3/4/2010 | 3/4/2010 | P | PASS |
Dave Hannah
|
|
|
|
General Inspection | 3/2/2009 | 3/4/2009 | 3/4/2009 | A | PASS |
Clint A Smith
|
|
|
Site looks good. D. I. protection in the south parking lot has been removed. No construction activity with that area. RP also has been updated.
|
General Inspection | 2/12/2009 | 2/12/2009 | 2/12/2009 | P | PASS |
Pat Lass
|
|
|
looks ok
|
General Inspection | 2/5/2009 | 2/5/2009 | 2/5/2009 | P | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine
|
General Inspection | 12/5/2008 | 12/5/2008 | 12/5/2008 | P | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine
|
General Inspection | 10/2/2008 | 10/2/2008 | 10/2/2008 | P | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine
|
General Inspection | 8/13/2008 | 8/13/2008 | 8/13/2008 | A | PART |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 8/8/2008 | 8/8/2008 | 8/8/2008 | P | PASS |
Clint A Smith
|
|
|
Site kept clean. No issues exsist at this time. CAS
|
General Inspection | 6/10/2008 | 6/13/2008 | 6/12/2008 | P | CANC |
Clint A Smith
|
|
|
Parking lot drains protected. CAS #460
|
General Inspection | 6/10/2008 | 6/10/2008 | 6/10/2008 | P | DEFR |
Clint A Smith
|
|
|
Wrong date of inspection. Defer to 6/13/08 CAS #460
|
Random Inspection | 6/10/2008 | 6/10/2008 | 6/10/2008 | P | PART |
Clint A Smith
|
|
|
Told RP that the 2 drain inlets in the parking lot next the on entrance of the project need to have protection installed. Also before next concrete pour date to maintain concrete washout area. Will check on drain protection on 06/13/08 CAS #460
|
Random Inspection | 5/9/2008 | 5/9/2008 | 5/9/2008 | A | PASS |
Daryl Spivey
|
|
|
looked at site while on plumbing conference...did not identify any problems at this time.........ds
|
Random Inspection | 6/28/2007 | 6/28/2007 | 6/28/2007 | | PASS |
|
|
|
Site appears to be in compliance,
|
Site Preparation | 5/16/2007 | 5/16/2007 | 5/16/2007 | P | PART |
Steven Webb
|
|
|
Reviewed site with rp; Reviewed major concerns at the site. Needs lined concrete washout area, containerize trash, steps needed to reduce trackout. Overall things are ok.
|