Site Final | 10/31/2007 | 10/31/2007 | 10/31/2007 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 1/8/2007 | 1/22/2007 | 1/22/2007 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay.
|
Site Preparation | 12/27/2006 | 1/8/2007 | 1/8/2007 | A | PASS |
Aimee Hughes
|
|
|
Received 48 hr. notice. Site looks good, all bmp's are in place and construction is underway.
|