Site Final | 7/27/2007 | 7/27/2007 | 7/27/2007 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 11/27/2006 | 12/13/2006 | 12/14/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay, reminded RP to maintain all bmp's especially sediment barriers.
|
Tracking Control | 10/30/2006 | 11/21/2006 | 11/27/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good.
|
Tracking Control | 10/9/2006 | 10/30/2006 | 10/30/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay.
|
Tracking Control | 10/9/2006 | 10/9/2006 | 10/9/2006 | P | PART |
Aimee Hughes
|
|
|
Talked to RP about reposting ESC sign.
|
Tracking Control | 9/19/2006 | 9/19/2006 | 9/19/2006 | P | PASS |
Aimee Hughes
|
|
|
Called all RP's in subdivision to remind them to make sure all bmp's are in place and being maintained. Some minimal trackout needs to be addressed and some ESC signs need to be posted.
|