DOC - Permit Finaled | 10/20/2009 | 10/20/2009 | 10/20/2009 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 7/12/2006 | 7/14/2006 | 7/18/2006 | P | PASS |
Steven Webb
|
|
|
Follow up inspection
|
BMP Violation | 7/10/2006 | 7/12/2006 | 7/12/2006 | P | PART |
Steven Webb
|
|
|
Follow up: Some plan implementation has been done but verbal correction to rp includes; 1) Access controls, 2) Signage at main entrance; 3) Dust abatement needed
|
Random Inspection | 7/10/2006 | 7/10/2006 | 7/10/2006 | A | FAIL |
Steven Webb
|
|
|
BMP's and other plan requirements have not been installed at time of inspection. RP said plan will be implemented no later than Wednesday (July 12, 2006). Will follow up.
|